Files
GR-raytracing/benchmarks/hip_psf_replay_2026-09-07/center_hotspot_jitter8_65536.events
T
wyj 7ddc58515a Doc: Record full-day parallel prebinning results and next steps
Document the producer-private adaptive path, the dummy support workload
diagnostics, the negative result of the old serial binning and the
2026-09-13 full-day comparison (splat 282.944 s vs atomic 481.417 s).
Add the corresponding raw logs, hotspot fixtures and runner evidence,
and lay out the staged plan toward a sub-240 s full-day render without
changing the default atomic path.
2026-09-14 19:16:00 -04:00

8.4 MiB

The file is too large to be shown. View Raw